Kingsmead prepares for the World Cup
Preparations for the 2003 World Cup are underway at Kingsmead
Leanne Pollock
17-Jan-2002
Preparations for the 2003 World Cup are underway at Kingsmead. New drainage
and Irrigation systems are currently being implemented in order to prepare
for the World Cup.
Pop-up sprinklers are being installed on the entire ground which are on an
automatic system and can be programmed. All irrigation pipes are
underground and there is a total of 42 sprinklers.
Using the Shelton drainage system, drainage is being installed from the
boundary to the edge of the pitch. The pipes used are 600mm below the
surface and will drain off from the North East Corner of the ground. In
addition to pipes there are also gravel bands which run from North to South
across the ground, these are situated 400mm apart across the entire length
of the ground.
The same drainage system is being installed at Chatsworth in February.